PROJECT TYPE


Conveyer Enclosure and Material Chute

Industrial Specialised Design

Jones Nicholson provided the structural design for the construction of a conveyor enclosure and chute. The overall purpose was to transport waste material to the base of a disused quarry that was licenced for landfill. The conveyor enclosure was constructed from shipping containers supported on steel frames founded on the sides of the quarry. The chute was constructed from 2m diameter steel pipe also supported on steel frames.