PROJECT TYPE


Eraring Power Station

Industrial Specialised Design

Jones Nicholson were responsible for the structural design and construction of a temporary platform to provide access for various remedial works on one of the 200m high chimney stacks at Eraring Power Station.

Works included the replacement of stack capping elements and lightning rods. An internal and external condition survey was also carried out.

The platform was designed in aluminium to ensure weight limitations for helicopter lift installation were maintained. The platform was designed to be re-usable in the future.

 

Client: Eraring Power Station

Construction: Difficult Access Engineering